We Repair - Reinstate - Protect - Improve
We Repair - Reinstate - Protect - Improve
Transformer oil leaks
Pipe was under the minimum required wall thickness at the flange
The above photos are of pipe repairs on gas lines that were under the minimum . The these were fully Engineered Repairs to ISO standards and could have been to ASME standards. These repairs could be rated for life of 20 years (with a possibility of extension).
Not only saving the client pipe replacement costs and saved the client extending shutdown durations and also eliminating Hot Work and eliminating other significant potential safety risks .
The pipes before starting the pit removal and coating
The above photos are of pipe repairs on corroded 20 and 24” dia hot export gas lines. The work was done whilst the plant was still in operation, not only saving the client pipe replacement costs but also saving the client on not having to shut down during the Site Solutions (TD) Ltd’s workscope. Prior to start the pipes were client inspected and all work fully risk assessed.
Leaking pipes
Above photos are of a gas vent line with holes found, using a non-engineered solution, where we plate bonded and composite wrapped. The repair saved the client the cost of removing and replacing the pipework, eliminating the hotwork requirements and associated risks
Leaking pipes
Flange Face damage before repair
View outside a typical vessel
Leaking nozzles
Badly damaged lobe pump impellor
Riser before. Was corroded and Boot Top was damaged
Tower before modification
Door repairs needed doing and door seals needed reinstatement